Scene 2 / 7 10:30 WITA — Kamis, 30 April 2026 · Pak Dwi buka PM Calendar. 30 hari × 30 unit dalam 1 view. Interval service per-OEM otomatis (Komatsu 250/500/1000 jam, Hitachi mirip). Foxel optimize downtime window supaya tidak konflik dengan produksi target RKAB. 10:30 WITA — Thursday, 30 April 2026 · Mr. Dwi opens the PM calendar. 30 days × 30 units in one view. Per-OEM service intervals auto-populated (Komatsu 250/500/1000 h, Hitachi similar). Foxel optimises downtime windows to avoid conflicts with RKAB production targets.
PM Calendar — 30 Hari · 12 Unit Utama30 Days · 12 Primary Units
Auto-generated dari engine-hour counter · sinkron dengan rencana produksi M1Auto-generated from engine-hour counters · synced with M1 production plan
Pak Dwi Hartono
Maintenance Manager
DH
PM 30 hari depanNext 30-day PM
28
12 routine · 14 major · 2 overhaul12 routine · 14 major · 2 overhaul
Total downtime PMTotal PM downtime
164 jam
5,5% utilisation loss5.5% utilisation loss
Crew requiredCrew required
4 tim
lead + 2 mekanik per timlead + 2 mechanics per team
Estimasi cost 30 hari30-day est. cost
IDR 1,28 M
parts 820jt + labor 460jtparts 820M + labor 460M

Gantt 30 hari · 30 April – 30 Mei 202630 April – 30 May 2026

Unit W18 · 30Apr-6May W19 · 7-13 W20 · 14-20 W21 · 21-27 W22
301234 78910111213 14151617181920 21222324252627 282930
EX-04 Hitachi CM
EX-01 Komatsu 500h 250h
EX-02 Komatsu 250h
EX-05 Hitachi 500h OVH 1000h
DT-005 HD465 250h
DT-006 HD465 INSP
DT-007 HD465 250h
DT-011 HD465 500h+BRG
DZ-01 Komatsu OVH 1000h
DZ-02 D85ESS-2 250h
GR-01 CAT 140M CM
DR-01 DM45 500h
PM — Preventive (scheduled)Preventive (scheduled) CM — Corrective (unplanned)Corrective (unplanned) OVH — Overhaul major (1000h+)Major overhaul (1000h+) INSP — Inspection / post-repairInspection / post-repair Kolom warna orange = hari iniOrange column = today

Saran Optimisasi Foxel · 4 actionsFoxel Optimisation Suggestions · 4 actions

1
Pindahkan DZ-01 OVH dari 1/5 ke 3/5Shift DZ-01 OVH from 1/5 to 3/5
Hindari bentrok dengan EX-04 repair · crew available 3/5Avoid clash with EX-04 repair · crew free 3/5
2
Batch DT-005 + DT-007 PM di 1/5Batch DT-005 + DT-007 PM on 1/5
Sharing crew + parts picking → hemat 3 jamShared crew + parts picking → saves 3 h
3
Advance DT-011 500h+bearing ke 5/5 (dari 9/5)Advance DT-011 500h+bearing to 5/5 (from 9/5)
Vibration trend tinggi · tidak tunggu interval penuhHigh vibration trend · don't wait full interval
4
Schedule EX-05 OVH pada weekend 24/5Schedule EX-05 OVH for weekend 24/5
Tidak konflik dengan TNB shipment #9 (15/5) atau DMO PLN (18/5)No conflict with TNB shipment #9 (15/5) or PLN DMO (18/5)