Scene 0 / 7 07:30 WITA — Kamis, 30 April 2026 · Pak Dwi Hartono (Maintenance Manager) buka Foxel Fleet. 30 unit alat berat terpantau KOMTRAX/VisionLink telemetry. EX-04 masih di workshop, spare part tiba sore ini. 3 unit PM hari ini, 1 DT-011 alert vibration. OEE bulan April 72,4%. 07:30 WITA — Thursday, 30 April 2026 · Mr. Dwi Hartono (Maintenance Manager) opens Foxel Fleet. 30 heavy units tracked via KOMTRAX/VisionLink telemetry. EX-04 still in workshop, spare parts arrive this afternoon. 3 units on PM today, DT-011 vibration alert. April OEE 72.4%.
Fleet Health — 30 Unit OverviewFleet Health — 30-Unit Overview
KOMTRAX + VisionLink + ConSite · update setiap 5 menitKOMTRAX + VisionLink + ConSite · updated every 5 minutes
Pak Dwi Hartono
Maintenance Manager · POM-1Maintenance Manager · POM-1
DH

Selamat pagi, Pak Dwi.Good morning, Pak Dwi.

30 unit dikelola · 22 operasi · 3 PM hari ini · 2 CM (termasuk EX-04 hari ke-8 workshop) · OEE April 72,4%. Spare EX-04 tiba 16:00 sore ini, repair mulai besok.30 units managed · 22 running · 3 on PM today · 2 on CM (incl. EX-04, day 8 in workshop) · April OEE 72.4%. EX-04 parts arrive 16:00 today, repair starts tomorrow.

Unit Operasi / TotalRunning / Total
22 / 30
availability 73%73% availability
-4%
OEE AprilApril
72,4%
target 82% · gap 9,6pp82% target · 9.6 pp gap
-1,2pp
MTBF rata-rataaverage
184 jam
target 240 · excavator 156 jam240 target · excavator 156 h
+8h
Cost / jam fleetCost / fleet-hour
IDR 1,82 jt
USD 112/hr · budget 1,65jtUSD 112/h · budget 1.65M
+10%

Kategori Alat — Status & HealthEquipment Category — Status & Health

6 kategoricategories
Excavator5
Hitachi EX1200 (2) · Komatsu PC850 (2) · PC400 (1)
3 OP1 PM1 CM
Dump Truck8
Komatsu HD465 (6) · HD785 (2)
7 OP1 PM
Dozer3
Komatsu D85ESS-2 (2) · D155 (1)
3 OP
Grader1
CAT 140M
1 CM
Drill Rig1
Atlas Copco DM45
1 OP
Support12
Water truck, fuel truck, lighting, LV
8 OP1 PM3 STBY
UnitOEM / ModelStatusStatusAvailabilityMTBFCost/jamCost/h
EX-04Hitachi EX1200CM · Day 8
42%
156 jamhIDR 2,8 jt
GR-01CAT 140MCM · Day 2
61%
92 jamhIDR 1,4 jt
EX-05Hitachi EX1200OP
88%
212 hIDR 2,1 jt
EX-01Komatsu PC850PM · 500h
85%
198 hIDR 2,0 jt
DT-011Komatsu HD465OP · alert vibrasivib. alert
76%
174 hIDR 1,4 jt
DT-006Komatsu HD465OP · retrainingretraining
82%
196 hIDR 1,3 jt
EX-02Komatsu PC850OP
91%
245 hIDR 1,8 jt
DZ-02Komatsu D85ESS-2OP · Pak Sugeng
94%
268 hIDR 1,1 jt
+ 22 unit lainnya — lihat semua 30 unit →

Alert AktifActive Alerts

3
EX-04 · Day 8 workshop — spare part arriving 16:00EX-04 · Day 8 in workshop — parts arriving 16:00
Hydraulic pump Hitachi 4D4GH88A. Lead time overdue 3 hari. Repair planned 1–2 Mei, commissioning 3 Mei.Hydraulic pump Hitachi 4D4GH88A. 3-day overrun on lead time. Repair planned 1–2 May, recommissioning 3 May.
DT-011 · vibrasi abnormal di rear axleDT-011 · abnormal rear-axle vibration
KOMTRAX deteksi vibrasi +35% vs baseline. Recommend: inspeksi bearing di PM berikut (5/5, 500-hr service).KOMTRAX detected +35% vibration vs baseline. Recommend: bearing inspection at next PM (5/5, 500-hr service).
3 unit PM dalam 48 jam3 units due PM within 48 hours
EX-01 (30/4 hari ini), DT-007 (1/5), DZ-01 (1/5). Crew Pak Kusno assigned.Crew Mr. Kusno assigned.

PM 7 Hari DepanNext 7-Day PM

12 PM
30/4EX-01500-hr service · 12 jam downtime12-h downtime
1/5DT-007250-hr · oil change + filteroil change + filter
1/5DZ-011000-hr major · 20 jam downtime20-h downtime
2/5EX-04CM repair mulai · Pak Kusno
3/5DT-005250-hr service
5/5DT-011500-hr + bearing checkbearing check
5/5EX-02250-hr routine
6/5GR-01CM commissioningCM recommissioning
Kalender 30 hari →30-day calendar →