Scene 4 / 7 14:00 WITA — Jumat, 1 Mei 2026 · Pak Kusno di workshop. Repair EX-04 sudah masuk step 4 dari 8. Tablet rugged memandu step-by-step, torque spec presented per bolt, foto before/during/after diupload saat tiap step selesai, parts auto-consume di Odoo Inventory. 14:00 WITA — Friday, 1 May 2026 · Mr. Kusno in the workshop. EX-04 repair has reached step 4 of 8. The rugged tablet guides each step, torque specs appear per bolt, before/during/after photos upload on each step-complete, and parts auto-consume in Odoo Inventory.
Workshop — bukan kertas lagiWorkshop — no more paper

Mekanik pegang tablet, bukan checklist kusut.Mechanics hold a tablet, not a crumpled checklist.

Sebelum Foxel: SOP dicetak, paraf pena, foto kamera terpisah, parts dicatat di buku, closeout 3 hari setelah repair. Dengan Foxel: SOP tervisualisasi dengan torque tooltip, foto otomatis masuk WO, parts auto-consume, dan WO tertutup saat step 8 done.Before Foxel: printed SOP, pen signatures, separate camera, parts logged in a book, closeout 3 days after repair. With Foxel: SOP with torque tooltips, auto-attached photos, auto-consume parts, and the WO closes as soon as step 8 is done.

Torque spec per boltTorque spec per bolt

Tap ikon torque wrench, dapat nilai langsung dari Hitachi manual. Bluetooth torque tool sync nilai aktual.Tap the torque-wrench icon for the spec direct from the Hitachi manual. A Bluetooth torque wrench syncs actual values.

Parts auto-consumeAuto-consume parts

Scan QR part → Odoo Inventory turun 1 qty, link ke WO, unit cost ter-allocate ke EX-04 asset record.Scan the part QR → Odoo Inventory decrements 1 qty, links to WO, unit cost allocated to EX-04 asset record.

Sinkron dengan Planning Modul 1Synced with Planning Module 1

Saat step 8 done, EX-04 flag "available" kembali. Ir. Sudarto lihat slot terbuka di Daily Plan Generator — auto update.When step 8 is done, EX-04 goes "available" again. Mr. Sudarto sees the slot open in the Daily Plan Generator — auto-updated.
Repair EX-04 — Step 4 / 8Repair EX-04 — Step 4 / 8
Pak Kusno · Lead Mechanic · 14:00 WITAMr. Kusno · Lead Mechanic · 14:00 WITA
KS
WO-2026-0501
EX-04 hydraulic pump · 18 jam labor
45%
1. LOTO & depressurize1. LOTO & depressurize
07:00-07:42 · selesaidone
45m
2. Drain oli2. Drain oil
07:45-09:10 · 420L ke waste tankto waste tank
1,5h
3. Disconnect & remove pump3. Disconnect & remove pump
09:15-13:05 · crane supportsupport
4h
4
4. Install pump baru + seal kit4. Install new pump + seal kit
AKTIF · 13:10 — ETA 17:00ACTIVE · 13:10 — ETA 17:00
4D4GH88A hydraulic pump · qty 1 ✓ 9A8-1034 seal kit · qty 1 ✓ 6E2-7721 bearing SKF · qty 2 ✓ B-M20 bolt 12.9 · qty 12 scan pending
Torque spec:Torque spec: mounting bolt 450Nm cross-pattern · final 520Nm (2-pass) mounting bolt 450Nm cross-pattern · final 520Nm (2-pass)
BEFORE ✓
REMOVE ✓
INSTALL ●
AFTER
6h
5
5. Refill oli + bleed lines5. Refill oil + bleed lines
belum mulainot started
2h
6
6. Commissioning test6. Commissioning test
2/5 07:00 jadwalscheduled
2,5h
7
7. QA Pak Dwi7. QA by Mr. Dwi
menunggupending
45m
8
8. Release & notify8. Release & notify
menunggupending
30m