Selamat pagi, Pak Iwan.
Good morning, Pak Iwan.
4 stockpile aktif, 142.300 ton di lantai senilai IDR 38,6 miliar. 1 pile kritis suhu, 1 shipment barge 6 hari lagi — semua di satu layar.
4 active stockpiles, 142,300 t on the yard worth IDR 38.6 B. 1 pile critical on temperature, 1 barge shipment in 6 days — all on a single screen.
Total InventoryTotal Inventory
142.300 t
2 ROM · 2 produk
2 ROM · 2 product
4,2%
Nilai di LantaiValue on Yard
IDR 38,6 M
≈ USD 2,37 juta · harga HBA index
≈ USD 2.37 M · HBA-indexed
2,1%
Buyer CoverageBuyer Coverage
87%
inventory vs komitmen 30 hari
inventory vs 30-day commitments
StabilStable
CV Rata-rataAvg CV
4.942 GAR
weighted semua pile · spec 4.800-5.200
weighted across piles · spec 4,800-5,200
Dalam spekIn spec
Area Stockpile PT KTS · 8,2 ha · Kutai Kartanegara
PT KTS Stockpile Yard · 8.2 ha · Kutai Kartanegara
42.800t
KapasitasCapacity85% / 50.000 t
28.600t
KapasitasCapacity57% / 50.000 t
48.200t
KapasitasCapacity64% / 75.000 t
22.700t
KapasitasCapacity38% / 60.000 t
Suhu pilePile temperature
<40 °C normal<40 °C normal
40-50 °C
50-60 °C pantau50-60 °C watch
>60 °C kritis>60 °C critical
Coverage Buyer 30 Hari
30-Day Buyer Coverage
Komitmen kontrak vs inventory siap kirim
Contract commitment vs ready-to-ship inventory
TNB Genco Sdn Bhd
75.000 t · pickup 29/4 · CV 5.000 GAR min
75,000 t · pickup 29/4 · CV 5,000 GAR min
48.200 t
64%
kurang 27k t
short 27k t
PLN Nusantara (DMO)
30.000 t · pickup 5/5 · CV 4.500 GAR min
30,000 t · pickup 5/5 · CV 4,500 GAR min
22.700 t
76%
kurang 7,3k t
short 7.3k t
Adani Bunker (spot)
15.000 t · pickup 12/5 · CV 4.800 GAR min
15,000 t · pickup 12/5 · CV 4,800 GAR min
28.600 t
191%
cukup
covered
Vietnam EVN (lookahead)
50.000 t · pickup 28/5 · CV 4.800 min
50,000 t · pickup 28/5 · CV 4,800 min
pipeline
produksi W18-W20
production W18-W20
Total 30 hari
30-day total
170.000 t · USD 13,9 M
Hotspot risiko — ROM-North sektor NE
Hotspot risk — ROM-North NE sector
Suhu 58 °C naik 6 °C dalam 24 jam. SOP reshape + cooling compaction diperlukan hari ini. Lihat detail →
Temperature at 58 °C, up 6 °C in 24 hours. SOP reshape + cooling compaction required today. View detail →
Shipment TNB — Product-A kurang 27k t
TNB shipment — Product-A short 27k t
Barge cap pelabuhan 29/4 14:00. Perlu blend tambahan 27.000 t dari ROM-South & ROM-North sebelum 28/4 06:00. Buka Optimizer →
Barge berths 29/4 14:00. Need extra 27,000 t blended from ROM-South & ROM-North before 28/4 06:00. Open Optimizer →
15 DT inbound dari Pit North — tiba 09:30
15 DT inbound from Pit North — ETA 09:30
Block PN-B3-02 (blast 22/4). Estimasi 420 ton ROM prelim CV 5.200 GAR, target ROM-South. Siapkan Lot →
Block PN-B3-02 (blasted 22/4). Estimated 420 t ROM prelim CV 5,200 GAR, destined ROM-South. Prep Lot →
Detail Pile — Product-A (Premium)
Pile Detail — Product-A (Premium)
5 layer FIFO aktif · 48.200 t · dialokasi TNB shipment 29/4
5 active FIFO layers · 48,200 t · allocated to TNB shipment 29/4
Pilih lain dengan klik pile
Select another by clicking a pile
5 Layer FIFO (atas → bawah)
5 FIFO layers (top → bottom)
L-038 · terbarunewest
9.400 t · CV 5.120
L-035
11.800 t · CV 5.080
L-031
10.200 t · CV 5.100
L-028
8.700 t · CV 5.050
L-024 · tertuaoldest
8.100 t · CV 5.075
Kualitas Weighted
Weighted Quality
CV (GAR)
5.085 ✓
TM
15,2%
Ash (adb)
5,4% ✓
S total
0,40% ✓
Ukuran rataAvg size
-50 mm 92%
Valuasi & Alokasi
Valuation & Allocation
Harga HBA refHBA ref price
USD 82,15/t
Adj CV/TMAdj CV/TM
USD 82,40/t
Nilai pilePile value
USD 3,97 M
Dialokasi TNBTNB allocated
48.200 t (100%)
StatusStatus
Siap kirimReady to ship