Scene 1 / 1009:30 WITA — Kamis, 23 April 2026 · 15 dump truck antri di WB-01 membawa ROM dari blok PN-B3-02 (post-blast 22/4). Foxel mulai menyusun Lot L-042 otomatis — setiap tiket WB ditag dengan block origin, operator, ETA ke ROM-South.09:30 WITA — Thursday, 23 April 2026 · 15 dump trucks queue at WB-01 carrying ROM from block PN-B3-02 (blasted 22/4). Foxel starts assembling Lot L-042 automatically — every weighbridge ticket is tagged with block origin, operator, and ETA to ROM-South.
Lot Masuk — Live Weighbridge FeedLot Inbound — Live Weighbridge Feed
WB-01 (Avery) aktif · auto lot-building: ON · stream latency 2,1 sWB-01 (Avery) active · auto lot-building: ON · stream latency 2.1 s
Ir. Iwan Setiawan
Stockpile SupervisorStockpile Supervisor
IS
Truk Hari IniTrucks Today
47
32 dari Pit North · 15 dari Pit South32 from Pit North · 15 from Pit South
Tonase ROM MasukROM Tonnage In
1.318 t
target harian 1.600 t · 82% tercapaidaily target 1,600 t · 82% achieved
Lot DibangunLots Assembled
4
L-039 tutup · L-040, L-041 siap lab · L-042 openL-039 closed · L-040, L-041 awaiting lab · L-042 open
Cycle Time RataAvg Cycle Time
48 min
normal range 45-55 · aktual stabilnormal range 45-55 · stable
10 tiket valid · payload tolerance ±3% OK · tidak ada ghost trip10 tickets valid · payload within ±3% · no ghost trip detectedSemua tiket →All tickets →
Lot Builder (otomatis)Lot Builder (auto)
Foxel akumulasi tiket sampai 500 t, lalu tutup lot & kirim sampel ke labFoxel accumulates tickets up to 500 t, closes the lot & sends a sample to the lab
OPENOPEN
L-042
dibuka 09:18 · 10 tiket akumulasi · tujuan ROM-Southopened 09:18 · 10 tickets accumulated · destined ROM-South
Tonase saat iniCurrent tonnage289,2 t
Target tutupClose target500,0 t
Blok asalSource blockPN-B3-02
Tujuan pileDestination pileROM-South
Progress akumulasiAccumulation progress289,2 / 500 t 58%
ETA tutup lot: 10:45 WITA (estimasi 7 truk lagi). Saat tutup, Foxel auto-generate work order sampling ke Ibu Linda (Lab).ETA lot close: 10:45 WITA (est. 7 more trucks). On close, Foxel auto-generates a sampling work order to Mrs. Linda (Lab).
Pit North Bench 3 — GeologiPit North Bench 3 — Geology
Volume blastBlast volume4.200 t recoveryrecovery
CV model (adb)CV model (adb)5.180 kcal/kgkcal/kg
SR blokBlock SR6,1 BCM/t
Drill patternDrill pattern7×8 · ANFO 420 kg
Estimasi Prelim Kualitas — berdasarkan model grade controlPreliminary Quality Estimate — from grade-control model
Prediksi Foxel dari 3 drill hole (DH-125, DH-127, DH-129). Hasil lab fisik akan menggantikan angka ini setelah L-042 tutup dan sampling dilakukan.Foxel prediction from 3 drill holes (DH-125, DH-127, DH-129). Physical lab results will override these once L-042 closes and sampling is performed.