Scene 2 / 1013:00 WITA — Kamis, 23 April 2026 · Lot L-042 sudah tutup jam 10:48 dengan total 502,4 ton. Ibu Linda Wijaya (Lab Manager) input hasil analisis fisik. Foxel menggantikan angka prelim dengan hasil real lab, auto-klasifikasi lot, dan draft Certificate of Analysis.13:00 WITA — Thursday, 23 April 2026 · Lot L-042 closed at 10:48 with a total of 502.4 t. Mrs. Linda Wijaya (Lab Manager) enters physical analysis results. Foxel replaces the prelim numbers with real lab values, auto-classifies the lot, and drafts the Certificate of Analysis.
PN-B3-02 · 502,4 t · diterima 10:50PN-B3-02 · 502.4 t · received 10:50
L-041TUNGGUPENDING
PN-B2-05 · 498,7 t · TM in-progressPN-B2-05 · 498.7 t · TM in-progress
L-040TUNGGUPENDING
PS-B1-03 · 501,2 t · millingPS-B1-03 · 501.2 t · milling
L-039SELESAIDONE
PN-B3-01 · CV 5.060 GARPN-B3-01 · CV 5,060 GAR
L-038SELESAIDONE
PN-B3-01 · CV 5.120 GARPN-B3-01 · CV 5,120 GAR
SLA lab internal: 4 jam dari sample masuk → COA publishedInternal lab SLA: 4 hours from sample-in to COA published
Analisis Sample — Sample Analysis — Lot L-042
Increment sampling 60 kg (ISO 18283) · composite 4 kg · sub-sample 1 kg untuk tiap testIncrement sampling 60 kg (ISO 18283) · composite 4 kg · 1 kg sub-sample per test
Lot L-042 memenuhi spesifikasi untuk Product-A (Premium). Foxel merekomendasikan tujuan pile ROM-South, prioritas alokasi untuk blend TNB Genco (pickup 29/4).Lot L-042 meets Product-A (Premium) specs. Foxel recommends ROM-South as destination and prioritises allocation to the TNB Genco blend (pickup 29/4).
CV (GAR)5.230✓ melebihi min 4.800✓ above 4,800 min
TM (ar)15,6 %✓ < max 18%✓ < 18% max
Ash (adb)5,6 %✓ < max 6,5%✓ < 6.5% max
S (ar)0,36 %✓ < max 0,5%✓ < 0.5% max
Preview COA (internal)COA Preview (internal)
PDF · A4
K
PT Karya Tambang Sejahtera
Coal Quality Laboratory · Samarinda
CERTIFICATE OF ANALYSIS
COA NoCOA-L042-2026-0423
Lot IDL-042
Source BlockPN-B3-02
Tonnage502.4 t
Sampled23/4/2026 10:50
Analysed23/4/2026 12:45
Parameter
adb
ar
CV (kcal/kg)
5,420
5,230
TM / IM (%)
6.4
15.6
Ash (%)
5.6
4.9
VM (%)
41.2
-
FC (%)
46.8
-
S total (%)
0.41
0.36
HGI
48
Analyst: Rudi Hermawan Reviewed: Ir. Linda Wijaya, S.T
BSrE-READY
COA ini akan terbit saat Ibu Linda klik "Finalisasi". Link otomatis ke Lot L-042 untuk traceability downstream.This COA publishes once Mrs. Linda clicks "Finalize". It is automatically linked to Lot L-042 for downstream traceability.
Perbandingan dengan PrelimPrelim vs Actual
CV: prelim 5.180 → aktual 5.230(+50 deviasi 1,0%)
TM: prelim 15,8 → aktual 15,6(-0,2)
Ash: prelim 5,4 → aktual 5,6(+0,2)
S: prelim 0,38 → aktual 0,41(+0,03)
Model grade control akurat ~98,9% — Foxel gunakan data ini untuk tune ulang prediksi blok berikutnya di Pit North Bench 3.Grade-control model accuracy ~98.9% — Foxel uses this data to re-tune predictions for next blocks in Pit North Bench 3.