Scene 5 / 11 09:30 WITA — Pak Suparjo (Mine Captain / Shift Supervisor) · Shift pagi sudah mulai. Briefing crew di muster point — 43 orang, JSA siap, hazard hari ini sudah disamakan. 09:30 WITA — Mr. Suparjo (Mine Captain / Shift Supervisor) · Morning shift underway. Crew briefing at the muster point — 43 people, JSA ready, today's hazards aligned.
Shift Briefing di genggaman Supervisor Shift briefing in the supervisor's hand

Dari plan ke crew.
Tidak ada yang hilang di WhatsApp.
From plan to crew.
Nothing lost in WhatsApp.

Pak Suparjo dulu briefing pakai kertas + WhatsApp group. Hari ini Foxel memberinya: task list shift, crew attendance, JSA hazard, dan broadcast briefing ke semua operator sekaligus. Mr. Suparjo used to brief with paper + a WhatsApp group. Today Foxel gives him: shift task list, crew attendance, JSA hazards, and a broadcast briefing to all operators at once.

Shift Pagi — Pit North + South Morning Shift — Pit North + South

07:00 — 15:00 WITA · Crew 43 orang (Pama 26 + KTS 17) · 4 excavator + 6 DT aktif 07:00 — 15:00 WITA · 43 crew (Pama 26 + KTS 17) · 4 excavators + 6 haul trucks active

Target
2.000 t
OB
13,7k BCM
Hazard
3

Kenapa ini penting untuk KTT Why this matters to KTT

Jika supervisor tidak brief hazard dengan benar, fatality bisa terjadi — dan KTT yang akan diperiksa Inspektur Tambang. JSA digital + e-signature crew = audit-proof. If a supervisor mis-briefs a hazard, a fatality can occur — and the KTT is answerable to the Mine Inspector. Digital JSA + crew e-sign = audit-proof.

09:30
4G 74%
SP

Pak Suparjo

Mine Captain · Shift Pagi · Pit North Mine Captain · Morning Shift · Pit North

⦿ Shift berjalan · 2 jam 30 menit ⦿ Shift in progress · 2 h 30 min
Rencana Shift Pagi — 22/4 Morning Shift Plan — 22/4
07:00 → 15:00 WITA
KTT approved 43 crew 2.000 t target
4 Tugas Shift Ini 07:00-15:00
1

Coal getting · Blok PN-B2-02 Coal getting · Block PN-B2-02

Target 920 ton · 8 jam produktif Target 920 t · 8 productive hours
EX-01 Wahyudi DT-001/002/003
2

OB removal · Blok PN-B3-01 OB removal · Block PN-B3-01

Target 4.200 BCM Target 4,200 BCM
EX-02 Sutrisno DT-005/006
3

Coal getting · Blok PS-B1-02 Coal getting · Block PS-B1-02

Target 620 ton Target 620 t
EX-03 Hadi DT-007
4

Drilling dev · PN-B4-01 Dev drilling · PN-B4-01

28 hole · persiapan blast Kamis 28 holes · prep for Thursday blast
DR-01 Kurniawan ANFO 420 kg
Crew Hadir (43/43) 100%
WR

Wahyudi R.

EX-01 Operator · Pama

✓ Hadir
SH

Sutrisno H.

EX-02 Operator · Pama

✓ Hadir
HP

Hadi P.

EX-03 Operator · KTS

✓ Hadir
+ 40 crew lainnya + 40 more crew
Hazard & JSA — WAJIB BRIEFING
Hujan sore (probabilitas 65%) Afternoon rain (65% probability)

BMKG: hujan lebat 14-17. Haul road PN-B3 curam. Grader + water truck standby. BMKG: heavy rain 14-17. PN-B3 haul road steep. Grader + water truck standby.

Crossing PS-B1/B2 — spotter wajib PS-B1/B2 crossing — spotter required

DT-007 crossing EX-05. Radio check setiap crossing. DT-007 crosses EX-05. Radio check on every crossing.

JSA Checklist Pre-shift 3/5
PPE inspection (hard hat, vest, boots) PPE inspection (hard hat, vest, boots)
Pre-shift equipment walkaround Pre-shift equipment walkaround
Radio comms test semua channel Radio comms test all channels
Hazard briefing ke crew (konfirmasi) Hazard briefing to crew (confirm)
Crew e-sign menerima JSA Crew e-signs JSA receipt
KTT Mobile 5 / 11 Operator Dispatch → Operator Dispatch →