Scene 4 / 11 09:00 WITA — Pak Budi sedang inspeksi Pit North · Notifikasi push tiba: rencana harian siap. Buka Foxel mobile, review & approve 1-tap — cukup 15 detik. 09:00 WITA — Mr. Budi is inspecting Pit North · Push notification arrives: daily plan ready. Opens Foxel mobile, reviews & approves with one tap — 15 seconds total.
Mobile-first approval untuk KTT Mobile-first approval for KTT

15 detik untuk approve.
Tanpa keluar dari pit.
15 seconds to approve.
Without leaving the pit.

KTT lapangan seperti Ir. Budi tidak bisa selalu di HQ. Foxel memberi mobile workspace ringan, offline-first, dengan BSrE e-signature tertanam — approval hukumnya sah tanpa harus kembali ke kantor. A field KTT like Mr. Budi cannot always be at HQ. Foxel gives him a lightweight, offline-first mobile workspace with embedded BSrE e-signature — so approvals are legally valid without returning to the office.

One-tap approval, audit trail lengkap One-tap approval, full audit trail

Setiap approval tercatat dengan timestamp, GPS lokasi, device fingerprint, dan BSrE signature untuk audit ESDM. Every approval is logged with timestamp, GPS location, device fingerprint, and BSrE signature for ESDM audit.

Offline-first, VSAT-friendly Offline-first, VSAT-friendly

Payload sync < 5 KB. Bekerja di atas VSAT dengan latency 600 ms — queue jika offline, auto-sync saat sinyal kembali. Sync payload < 5 KB. Works on VSAT with 600 ms latency — queued offline, auto-syncs when signal returns.

K3 briefing tertanam Embedded HSE briefing

Hazard hari ini otomatis muncul. KTT wajib konfirmasi sudah baca sebelum sign. Today's hazards surface automatically. KTT must confirm they've been read before signing.

09:00
VSAT 67% 4G 82%

Persetujuan

1 dari 3 · Rencana Harian 1 of 3 · Daily Plan
LIVE
Diajukan 08:28 · 32 menit lalu Submitted 08:28 · 32 min ago

Rencana Harian · Selasa 22 April Daily Plan · Tuesday 22 April

Disusun oleh Ir. Sudarto (Mine Planner) · Auto-generated dari Weekly W17 Prepared by Mr. Sudarto (Mine Planner) · Auto-generated from Weekly W17
Target Harian 5.667 ton
OB Removal 27.200 BCM
Stripping Ratio 4,80 (target)
Unit Aktif 4 ex + 7 DT
Pagi
2.000
Siang
1.950
Malam
1.717

5 Blok Aktif

PN-B2-02
EX-01 · Coal · CV 5.120 EX-01 · Coal · CV 5,120
2.670 t
PN-B3-01
EX-02 · OB (contractor) EX-02 · OB (contractor)
12.200 BCM
PS-B1-02
EX-03 · Coal · CV 4.880 EX-03 · Coal · CV 4,880
1.760 t
PS-B2-01
EX-05 · Coal (cover EX-04) EX-05 · Coal (backfills EX-04)
1.237 t
PN-B4-01
DR-01 · Drilling dev · 28 hole DR-01 · Dev drilling · 28 holes
dev

K3 Briefing (3 hazard) HSE Briefing (3 hazards)

Hujan sore 14-17 (65%) Afternoon rain 14-17 (65%)
Haul road PN-B3 tanjakan curam. Grader + water truck standby. PN-B3 haul road steep grade. Grader + water truck on standby.
Crossing PS-B1/B2 PS-B1/B2 crossing
Spotter wajib 08-12 WITA. Spotter mandatory 08-12 WITA.
💥
Drilling PN-B4-01 PN-B4-01 drilling
28 hole, 420 kg ANFO. Blast Kamis 24/4. 28 holes, 420 kg ANFO. Blast Thursday 24/4.
Persetujuan KTT KTT Approval
BSrE e-signature · Sertifikat valid s/d 2028-11-30 BSrE e-signature · Certificate valid through 2028-11-30
GPS: -0.485, 117.152 · 22/4 09:00 WITA
Rencana Harian 4 / 11 Supervisor Mobile → Supervisor Mobile →