Step 5 / 5 · OUTPUT 16:00 WITA — 24/4/2026 (Day 2 sore) · 2 hari setelah login pertama, Pak Andi sudah punya RKAB 2027 draft 80-halaman siap untuk review konsultan Mineserv. Biaya konsultan turun dari IDR 350jt (full production) ke IDR 85jt (review only). Waktu dari zero data ke RKAB draft: 48 jam. 16:00 WITA — 24/4/2026 (Day 2 evening) · Two days after first login, Mr. Andi has a 80-page 2027 RKAB draft ready for Mineserv consultant review. Consultant fee drops from IDR 350M (full production) to IDR 85M (review-only). From zero-data to RKAB draft: 48 hours.
Step 5 · RKAB 2027 Draft Generated
Format: e-RKAB template ESDM · output PDF + DOCX · BSrE-ready
Pak Andi + Ibu Nurul

RKAB 2027 Draft · 80 halaman · 9 bab · siap review MineservRKAB 2027 Draft · 80 pages · 9 chapters · ready for Mineserv review

48 jam dari zero data ke draft siap kirim. Tanpa Foxel butuh 3 bulan + IDR 350 juta ke konsultan. Dengan Foxel: 2 hari + IDR 85 juta (hanya untuk review & polish). Saving IDR 265 juta + 2,5 bulan.48 hours from zero-data to submission-ready draft. Without Foxel: 3 months + IDR 350M consultant fee. With Foxel: 2 days + IDR 85M (review & polish only). Savings: IDR 265M + 2.5 months.

Total SavingsTotal Savings
IDR 265 jt
+ 2,5 bulan waktu+ 2.5 months time
Halaman dokumenDocument pages
80
format ESDM e-RKABESDM e-RKAB format
Bab lengkapChapters complete
9 / 9
100%
Data point populateData points filled
247
auto dari wizardauto from wizard
Siap untukReady for
Mineserv
review & BSrE signreview & BSrE sign

9 Bab RKAB · Status9 RKAB Chapters · Status

100% complete
1
Pendahuluan & Profil PerusahaanIntroduction & Company Profile
dari SK IUP · Step 1from IUP decree · Step 1
4 pages
2
Eksplorasi & Sumber DayaExploration & Resources
dari JORC · 42,3 Mt resource · 18,2 Mt reservefrom JORC · 42.3 Mt resource · 18.2 Mt reserve
12 pages
3
Kegiatan KonstruksiConstruction Activities
jalan hauling · jetty · infrastrukturhaul road · jetty · infrastructure
6 pages
4
Kegiatan PenambanganMining Activities
Year 1: 200k t · SR 4,8 · 10 bulan produksiYear 1: 200k t · SR 4.8 · 10 prod months
14 pages
5
Pengolahan & BlendingProcessing & Blending
CV 5.200 GAR target · 1 ROM stockpileCV 5,200 GAR target · 1 ROM stockpile
8 pages
6
Pengangkutan & PenjualanTransport & Sales
Y1 Revenue USD 15,6 jt · 1 buyer Asian utilityY1 Revenue USD 15.6M · 1 Asian utility buyer
10 pages
7
Lingkungan & K3Environment & K3
AMDAL commitment · reklamasi 12 ha Y1 · LTIFR target 0,8AMDAL · reclamation 12 ha Y1 · LTIFR 0.8 target
10 pages
8
Tenaga Kerja & BiayaManpower & Cost
Y1: 180 pekerja (20 KTS + 160 kontraktor) · OPEX USD 11,2 jtY1: 180 workers (20 KTS + 160 contractor) · OPEX USD 11.2M
8 pages
9
Rencana Tahun BerikutNext-Year Plan
Y2 2028 projection · 4× ramp-up · 800k tY2 2028 projection · 4× ramp-up · 800k t
8 pages
⚠️ Reminder:Reminder: Ini draft Foxel, BUKAN final. Konsultan (Mineserv) harus review untuk: validasi metodologi geologi, signature geologi certified, revisi narasi spesifik konteks Paser. This is Foxel's draft, NOT final. Consultant (Mineserv) must review for: geology methodology validation, certified-geologist signature, Paser-context narrative polish.

Preview Hal. 1Page 1 Preview

PDF · A4
RENCANA KERJA DAN ANGGARAN BIAYA
(RKAB) TAHUN 2027
Nomor dokumenRKAB-MBM-2027-V1.0
Tanggal24 April 2026
Disusun olehFoxel + Mineserv review
BAB 1 — PENDAHULUAN

1.1 Profil Perusahaan. PT Menara Bara Muda (MBM) adalah perusahaan pertambangan batubara Indonesia yang memegang IUP Operasi Produksi nomor 425/KEP-MB/DESDM/2026, terbit 18 April 2026, masa berlaku 20 tahun, area 850 ha di Kabupaten Paser, Provinsi Kalimantan Timur.

1.2 Tujuan RKAB 2027. Dokumen ini memuat rencana kegiatan tahun pertama operasi (2027), meliputi konstruksi infrastruktur, kegiatan penambangan initial 200.000 t ROM, pengangkutan, penjualan, dan pemenuhan kewajiban sosial-lingkungan.

1.3 Ringkasan Eksekutif. Sumber daya JORC 2024: 42,3 Mt (Measured 12,8 Mt + Indicated 18,5 Mt + Inferred 11,0 Mt). Cadangan mineable: 18,2 Mt. Life of Mine: 13 tahun. Produksi tahun 1 direncanakan 200.000 ton ROM dengan SR 4,8 BCM/t, ramp-up ke 1,5 juta ton pada tahun ke-3...

+ 79 halaman lagi · semua dalam format ESDM standar+ 79 more pages · all in ESDM standard format
📄

RKAB siap → kirim ke Mineserv untuk review finalRKAB ready → send to Mineserv for final review

Foxel sudah pre-vet partner konsultan. Rate review-only: IDR 85 juta · ETA 7-10 hari. Alternatif: DIY review internal (tidak disarankan untuk first RKAB).Foxel has pre-vetted consultants. Review-only rate: IDR 85M · ETA 7-10 days. Alternative: internal DIY review (not recommended for first RKAB).

← Step 4 5 / 5 · END Landing M5 →