Foxel Demo / Modul 5 — RKAB Builder (Startup)Module 5 — RKAB Builder (Startup)
F
Foxel
Modul 5 · Startup TrackModule 5 · Startup Track

RKAB Builder — dari IUP kosong ke rencana tahunan approved.RKAB Builder — from empty IUP to approved annual plan.

Startup miner yang baru dapat IUP operasi produksi punya masalah: tidak ada data historis, konsultan mahal (IDR 200-500jt), waktu mepet. Foxel RKAB Builder pandu 6 step wizard dari JORC resource import sampai RKAB draft 9-bab siap review konsultan.Startup miners with a fresh operating IUP face a problem: no historical data, expensive consultants (IDR 200–500M), tight timelines. Foxel's RKAB Builder guides 6 wizard steps from JORC resource import to a 9-chapter RKAB draft ready for consultant review.

Perusahaan startup (beda dari PT KTS di M1-M4). Founder Pak Andi Wijaya dan co-founder/CFO Ibu Nurul Aini baru dapat IUP Operasi Produksi 850 ha di Paser Kalimantan Timur. Target RKAB 2027 siap submit sebelum 30 November 2026. Tanpa Foxel: butuh konsultan 3 bulan + IDR 350jt. Dengan Foxel: draft jadi dalam 2 hari, konsultan tinggal review & polish. A startup company (different from PT KTS in M1-M4). Founder Mr. Andi Wijaya and co-founder/CFO Mrs. Nurul Aini just received an 850-ha Operating IUP in Paser, East Kalimantan. Target: 2027 RKAB ready to submit before 30 November 2026. Without Foxel: 3-month consultant + IDR 350M. With Foxel: draft ready in 2 days; consultant just reviews & polishes.
⚠️ Catatan:Note: Modul ini untuk segmen pasar yang BERBEDA dari Modul 1-4. Persona target: startup miner (small-mid), bukan operating miner seperti PT KTS. This module serves a DIFFERENT market segment than Modules 1-4. Target persona: startup (small-mid) miner, not an operating miner like PT KTS.
6 Scene — Wizard Onboarding Startup Miner6 Scenes — Startup Miner Onboarding Wizard
Step 0

Dashboard kosongEmpty Dashboard

"Saya belum produksi apa-apa" · Foxel welcome tour, 3 onboarding step aktif"I haven't produced anything yet" · Foxel welcome tour, 3 active onboarding steps

Step 1

Import IUP + JORC ResourceImport IUP + JORC Resource

Upload IUP PDF · parse otomatis area, koordinat, masa IUP. Upload JORC report → extract reserve, seam, CV.Upload IUP PDF · auto-parse area, coordinates, IUP term. Upload JORC report → extract reserve, seam, CV.

Step 2

Wizard Mining MethodMining Method Wizard

Open-pit/underground? Dimensi bench, slope, SR estimasi, equipment sizing.Open-pit/underground? Bench dimensions, slope, SR estimate, equipment sizing.

Step 3

Benchmark LibraryBenchmark Library

5 mining operasi Kaltim anonymized (seperti KTS) sebagai referensi produktivitas, cost, ramp-up.5 anonymised East Kalimantan mining operations (like KTS) as references for productivity, cost, ramp-up.

Step 4

Production Ramp 3-Year3-Year Production Ramp

Year 1: 200k t · Year 2: 800k t · Year 3: 1.5M t. Sensitivity analysis harga HBA + variable cost.Year 1: 200k t · Year 2: 800k t · Year 3: 1.5M t. Sensitivity on HBA price + variable cost.

Step 5 · OUTPUT

RKAB 9-Bab Draft9-Chapter RKAB Draft

Foxel assembly 80-page draft dokumen, siap kirim Mineserv untuk polish final. Saved weeks & IDR 200jt.Foxel assembles an 80-page draft, ready to hand to Mineserv for final polish. Saves weeks and IDR 200M.