45 hari zero fatality · LTIFR 0,6 · semua target tercapai45-day zero fatality · LTIFR 0.6 · all targets met
Streak dimulai 27 Maret 2026 setelah incident Medical Treatment sebelumnya. Target PT KTS 2026: LTIFR <1,0, zero fatality, PROPER BIRU stable. Semua KPI hijau. Culture safety first membuahkan hasil.Streak began 27 March 2026 after the prior Medical Treatment incident. 2026 targets: LTIFR <1.0, zero fatality, stable PROPER BLUE. All KPIs green. Safety-first culture delivers.
45
hari zero fatalityzero-fatality days
LTIFR YTD
0,6
target 1,0 · hijau1.0 target · green
TRIR YTD
1,8
industry avg 2,5
Severity Rate
8,2
per 1000 hours
Near-miss minggu inithis week
3
proactive · target 2-4proactive · target 2-4
BBSO obsobs
42
behavior observation minggu inibehaviour observations this week
PROPER
BIRU 🔵
2025 · audit Sep 2026Sep 2026 audit
Incident Pyramid · 12-Month Rolling
Bird's ratio 1:10:30:600
Fatality0
Lost-Time Injury (LTI)2
Medical Treatment5
First Aid18
Near-miss47
Hazard ObservationHazard Observation124
BBSO (behavior)312
✓ Pyramid interpretation:
Rasio bawah:atas healthy (312:0). Worker aktif report hazard sebelum jadi incident. Pencegahan proactive.
Healthy bottom-to-top ratio (312:0). Workers actively report hazards before they become incidents. Proactive prevention.
Incident Terbaru · 7 HariLatest 7-Day Incidents
11
12/5 14:23
Near-miss DT-007 hampir tabrak LV
Haul road KM 2 · Pak Suparjo reported · investigation ongoing
NEAR-MISS
11/5 09:15
Hazard: oil leak workshop floor
Contained · spill kit deployed · 25 liter
HAZARD
10/5 15:40
BBSO: operator tidak pakai full PPE
Coaching · follow-up done
BBSO
9/5 07:22
Near-miss bench 3 edge
Operator close to edge · barricade reviewed
NEAR-MISS
8/5 13:10
First Aid: minor cut mekanik finger
Pak Kusno · dressed on-site · back to work
FIRST AID
7/5 11:45
Near-miss drill rig hydraulic spike
Pressure spike detected · operator safe
NEAR-MISS
PTW Aktif Hari IniActive PTW Today
8 permits
🔥 Hot Work · Welding exc EX-05 — workshop · Pak Kusno · expires 18:00
💥 Blasting · Block PN-B4-01 — Pit North · Pak Rudi · 14:30-15:00 WITA
⚡ Electrical · Panel workshop — 08:00-12:00 · done
🏔️ Working at Height · conveyor belt — stockpile · 2 person
+ 4 permits lainnya · semua active & signed