Scene 6 / 10 06:30 WITA — Selasa, 28 April 2026 · Shift pagi mulai. Pak Sugeng naik ke kabin Dozer D-02 Komatsu D85ESS-2. Recipe A sudah dikunci Ir. Sudarto kemarin — tablet rugged di kabin tampilkan urutan pick, tonase per pass, dan CV meter live. Setiap passing divalidasi otomatis. 06:30 WITA — Tuesday, 28 April 2026 · Morning shift begins. Mr. Sugeng climbs into the D-02 Komatsu D85ESS-2 cab. Recipe A was locked by Mr. Sudarto yesterday — the rugged in-cab tablet shows the pick sequence, per-pass tonnage, and a live CV meter. Every pass is auto-validated.
Eksekusi di Lantai — bukan rapat, bukan email Execution on the Floor — no meetings, no emails

Dari recipe ke dozer operator — zero hand-off loss. From recipe to dozer operator — zero hand-off loss.

Recipe yang Ir. Sudarto kunci kemarin sudah ada di tablet Pak Sugeng pagi ini, tanpa paper work order, tanpa WhatsApp, tanpa "saya lupa urutannya". Urutan pick, target tonase, tujuan lane — semua di satu layar rugged yang terpasang di kabin Dozer D-02. The recipe Mr. Sudarto locked yesterday is already on Mr. Sugeng's tablet this morning — no paper work order, no WhatsApp chatter, no "I forgot the sequence". Pick order, tonnage target, destination lane — all on a single rugged cab-mounted display on Dozer D-02.

Setiap passing dozer terhitung oleh IoT payload sensor. CV meter live membaca dari cross-belt analyser Siemens NIR — jika salah ambil lot (misal reach ke pile yang di-quarantine), alarm berbunyi sebelum batubara jatuh ke lane blend. Every dozer pass is counted by an IoT payload sensor. A live CV meter reads from a Siemens NIR cross-belt analyser — if the wrong lot is reached (say a quarantined pile), the alarm triggers before the coal drops into the blending lane.

Plan → Pit tablet dalam 8 detik Plan → Pit tablet in 8 seconds

Saat Ir. Sudarto klik "Lock", Foxel generate work order, notifikasi Pak Iwan (supervisor), push ke tablet dozer via 4G/Starlink, update jadwal loading di WB-02 — semuanya sinkron. When Mr. Sudarto clicks "Lock", Foxel generates the work order, notifies Mr. Iwan, pushes to the dozer tablet via 4G/Starlink, and updates the WB-02 loading schedule — all in sync.

Live CV meter cross-belt Live cross-belt CV meter

NIR analyser di belt conveyor ke Product-A output baca CV setiap 30 detik. Foxel jaga weighted CV di atas 5.050 — jika tren turun, adjust ratio lot pada sequence berikutnya otomatis. An NIR analyser on the belt conveyor feeding Product-A output reads CV every 30 seconds. Foxel keeps weighted CV above 5,050 — if the trend dips, the ratio of the next lot in the sequence is auto-adjusted.

Audit trail otomatis untuk setiap shipment Automatic audit trail for every shipment

Tonase per lot yang masuk Product-A output tersimpan di genealogy — nanti di Scene 8, shipment TNB bisa di-trace back ke blok asal, drill hole, bahkan operator DT yang membawa. Each lot's tonnage into the Product-A output is stored in the genealogy tree — later in Scene 8, the TNB shipment can be traced back to source block, drill hole, and even the DT operator who hauled it.

Tugas aktif · sequence #3 / 8 Active task · sequence #3 / 8
Pick 3.450 t dari L-035 → Lane Blend #2 Pick 3,450 t from L-035 → Blend Lane #2
Recipe A · TNB shipment 29/4 · CV target 5.000 GAR min Recipe A · TNB shipment 29/4 · CV target 5,000 GAR min
SekarangNow
1.240 t
Target taskTask target
3.450 t
ProgressProgress
36%
ETA
08:42
Urutan Pick — Recipe A Full Pick Sequence — Full Recipe A 8 langkah · 48 jam total 8 steps · 48 h total
L-042
Product-A · 23/4 · CV 5.230 Product-A · 23/4 · CV 5,230
500 t
L-038
Product-A · 19/4 · CV 5.120 Product-A · 19/4 · CV 5,120
498 t
3
L-035 (aktif)
Product-A · 16/4 · CV 5.080 · blend 40% Product-A · 16/4 · CV 5,080 · 40% blend share
3.450 t
4
L-031 / L-028
ROM-South · blend 35% ROM-South · 35% blend share
26.250 t
5
Pile ROM-North
⚠ bypass NE-2 · 25% ⚠ bypass NE-2 · 25%
18.750 t
6
Pass mix & homogenize Mix & homogenize pass
3 pass dozer cross-stack 3 cross-stack dozer passes
7
Sampling intermediat Intermediate sampling
→ Lab Ibu Linda (30 min) → Mrs. Linda's lab (30 min)
4 kg
8
Seal & serahkan ke Pak Iwan Seal & hand-off to Mr. Iwan
Final label · lock Product-A output Final label · lock Product-A output
75.000 t
CV Live · NIR Cross-belt Live CV · NIR Cross-belt
4,500 5,000 5,500
5.085
kcal/kg GAR · weighted live kcal/kg GAR · live weighted
TM 15,4%
Ash 5,5%
Last passLast pass 08:21
ValidatorValidator OKPASS