Scene 10 / 11 16:30 WITA — Akhir hari kerja, akhir bulan April · Pak Agus (PJO) perlu submit Laporan Produksi Bulanan ke MinerbaOne. Deadline 4 Mei. Foxel auto-generate, tinggal review + BSrE signature. 16:30 WITA — End of day, end of April · Mr. Agus (PJO) must submit the Monthly Production Report to MinerbaOne. Deadline 4 May. Foxel auto-generates, PJO just reviews + BSrE signs.

Laporan Produksi Bulanan — April 2025 Monthly Production Report — April 2025

Auto-generated dari data operasional Foxel · Submit via MinerbaOne · Due 4 Mei 2025 Auto-generated from Foxel operational data · Submit via MinerbaOne · Due 4 May 2025

12 hari sisa 12 days left
ROM April April ROM
171.300 ton
vs RKAB April vs RKAB April
100,8%
OB April
862 k BCM
SR April
5,03

Workflow Submit · 6 Langkah Submit Workflow · 6 Steps

Progress: 4/6 selesai · 2 menunggu review PJO Progress: 4/6 complete · 2 pending PJO review

Kumpulkan data produksi April Gather April production data ✓ Done

WB ticket, GPS trace, dispatch order, blending, lab COA — 1.847 data point tervalidasi. WB tickets, GPS traces, dispatch orders, blending, lab COA — 1,847 data points validated.

Auto · 2025-05-01 00:12 WITA

Reconcile dengan RKAB & stockpile Reconcile with RKAB & stockpile ✓ Done

Tonnage produced = tonnage ke stockpile + stock change. Match 99,7% (delta -428 t, dalam tolerance). Tonnage produced = tonnage to stockpile + stock change. Matches 99.7% (delta -428 t, within tolerance).

Auto · 2025-05-01 00:14 WITA

Generate laporan format ESDM Generate report in ESDM format ✓ Done

XML schema MinerbaOne v2.1, 23 section. Validated dengan ESDM XSD — 0 error. MinerbaOne XML schema v2.1, 23 sections. Validated against ESDM XSD — 0 errors.

Auto · 2025-05-01 00:15 WITA

Review internal KTT Internal KTT review ✓ Done

Pak Budi review dan approve production section (coal, OB, SR, K3, env) pagi ini 07:40. Mr. Budi reviewed and approved production sections (coal, OB, SR, HSE, env) this morning at 07:40.

Ir. Budi Santoso · 22 Apr 07:40 WITA
5

PJO BSrE e-signature PJO BSrE e-signature ⦿ Sekarang ⦿ Now

Pak Agus perlu sign digital dengan BSrE certificate. Klik "Sign & Submit" di panel kanan. Mr. Agus must apply a digital signature via BSrE certificate. Click "Sign & Submit" on the right panel.

6

Submit ke MinerbaOne Submit to MinerbaOne Pending Pending

Upload via API MinerbaOne (Dirjen Minerba). Foxel tunggu acknowledgment, simpan reference number. Upload via MinerbaOne API (Directorate General of Mineral and Coal). Foxel awaits acknowledgment and stores the reference number.

Preview Laporan · Halaman 1/23 Report Preview · Page 1/23

Laporan Produksi Bulanan — Batubara Monthly Coal Production Report

PT Karya Tambang Sejahtera · April 2025 PT Karya Tambang Sejahtera · April 2025

Diajukan ke Direktorat Jenderal Mineral dan Batubara · Kementerian ESDM Submitted to Directorate General of Mineral and Coal · Ministry of ESDM

IUP540/24/KEP-IUP/DESDM/2020
PeriodeApril 2025
Ref. RKABB-342/MB.07/DJB/2025
KTTIr. Budi Santoso (POU-1)
PJOIr. Agus Pramono
BSrEBSrE-KTS-PJO-2024-001

Bab I — Realisasi Produksi Chapter I — Production Realization

Parameter Rencana Aktual % Realisasi
Produksi ROM Batubara (ton)170.000171.300100,8%
OB Removal (BCM)816.000862.400105,7%
Stripping Ratio4,805,03104,8%
Penjualan DMO (ton)53.00054.700103,2%
Penjualan Ekspor (ton)110.000108.10098,3%
Total Penjualan (ton)163.000162.80099,9%

Bab II — Spesifikasi Kualitas Batubara Chapter II — Coal Quality Specification

Parameter Spec Rata-rata April Min / Max
CV GAR (kcal/kg)4.800 - 5.2005.0404.850 / 5.180
Total Moisture (%)≤ 2824,622,8 / 27,4
Ash (%)≤ 64,84,2 / 5,7
Sulphur (%)≤ 0,40,290,22 / 0,36

Bab III — Realisasi Royalti PNBP Chapter III — Royalty (PNBP) Realization

Item Volume (ton) ASP (USD/t) Revenue (USD) Rate % Royalti (IDR)
Penjualan DMO54.700653.555.5005,5%3,23 M
Penjualan Ekspor108.10095,210.291.1207,5%12,73 M
Total162.80085,013.846.62015,96 M

Royalti dibayar: 2 Mei 2025 · Referensi: SIMPONI-PNBP-KTS-2025-04 Royalty paid: 2 May 2025 · Reference: SIMPONI-PNBP-KTS-2025-04

KTT (Kepala Teknik Tambang) KTT (Technical Head)
Ir. Budi Santoso, M.T
POU-1 · POU-001/ESDM/2019
Reviewed 22 Apr 07:40 WITA Reviewed 22 Apr 07:40 WITA
PJO (Penanggung Jawab Operasional) PJO (Operational Responsible Person)
Ir. Agus Pramono
BSrE-KTS-PJO-2024-001
Menunggu BSrE signature Awaiting BSrE signature

BSrE E-Signature · Pak Agus (PJO) BSrE E-Signature · Mr. Agus (PJO)

Foxel sudah siap memasukkan BSrE digital signature. Klik button untuk men-sign dan submit ke MinerbaOne. Foxel is ready to apply the BSrE digital signature. Click the button to sign and submit to MinerbaOne.

BSrE
Sertifikat digital valid · BSSN (Balai Sertifikasi Elektronik) Digital certificate valid · BSSN (Electronic Certification Body)
BSrE-KTS-PJO-2024-001 · Expired 2026-05-15 · SHA256 ready BSrE-KTS-PJO-2024-001 · Expires 2026-05-15 · SHA256 ready

Laporan berhasil diajukan ke MinerbaOne Report successfully submitted to MinerbaOne

Ref ESDM: MBO-PROD-KTS-2025-04-000241 · BSrE hash tersimpan · Acknowledgment dalam 24 jam. ESDM Ref: MBO-PROD-KTS-2025-04-000241 · BSrE hash stored · Acknowledgment within 24 hours.

Kembali ke Dashboard Back to Dashboard
Akhir Demo · 11 Scene Selesai

Satu hari Ir. Budi sebagai KTT · end-to-end terekam, auditable, compliant. One day of Mr. Budi as KTT · end-to-end recorded, auditable, compliant.

Dari RKAB upload pagi pertama bulan Januari, sampai submit laporan bulanan ke MinerbaOne. Foxel menghubungkan rencana strategis dengan eksekusi di pit, real-time, dalam Bahasa, dengan compliance tertanam. From the RKAB upload on the first morning of January to the monthly submission to MinerbaOne. Foxel links strategic plans to pit-level execution — in real time, in Bahasa Indonesia, with compliance built in.

Kembali ke Landing Back to Landing Ulangi dari Scene 0 Restart from Scene 0
← Replan 10 / 11 Selesai · Ke Landing ↗ Finish · Landing ↗